FORGE/BY TRADE/ROOFING
i.FORGE — FOR ROOFING CONTRACTORS

The roof is still a roof.
The estimate is a different animal.

You lost the bid on the dormer because Aurora couldn't model it. The change-order on the rooftop unit died in your PM's email. Forge is the chest a working roofer would build for himself — because it was.

Charter — 1 of 2 seats filled
1 seats remaining. Locked rate forever.
ROOFING · CHARTER
Two Charter seats reserved for commercial roofing. One filled. One open.
Apply for Charter3-MIN ASSESSMENT →
i.The chest — opened for roofing

The drawers that matter most
when the truck door opens.

I
Hyperion Scan
A · INSTRUMENT

iPad Pro LiDAR. Walk the roof, get geometry and penetrations to a fused point cloud, line-item estimate in sixty seconds. Patented and protected.

II
Estimating
B · ESTIMATE

TPO, EPDM, modified, ballast, single-ply — assemblies that match what your crew actually installs, not what a generic SaaS thinks roofing is.

III
Treasury
C · CHANGE-ORDER

The change-order writes itself off the scan delta. The PM signs from the truck. Nothing dies in email.

IV
Crew · Dispatch
D · SCHEDULE

GC slipped two weeks. Reshuffle the crew before the cost lands on your P&L. The schedule remembers what the GC forgot.

THE ONE NO ONE ELSE HAS
Hyperion — for roofing.

Sixty seconds from walking the parapet to a line-item bid. The dormer Aurora couldn't model is the dormer Hyperion built itself to model.

See Hyperion →
ii.What Forge replaces — for roofing

What a Charter roofer typically consolidates from when they sign.

  • 01 · STACK ITEM
    AccuLynx
    Project pipeline + CRM + estimating for residential-tier work. Charter operators usually leave because the commercial side of the business needs assemblies and change-order tooling AccuLynx doesn't carry.
  • 02 · STACK ITEM
    ServiceTitan
    Dispatch + CRM. Replaces fine for residential service. Commercial re-roof + retrofit work outgrows it; the federation is the difference.
  • 03 · STACK ITEM
    Aerial-imagery reports
    Aerial measurement reports. Stay useful for properties Hyperion can't safely access. Charter operators report mixing the two for the first season, then dropping them for the bulk of commercial work.
  • 04 · STACK ITEM
    Aurora (residential solar attachment)
    Aurora is built for solar; for the roofers who run a solar attachment, Hyperion's same-day in-field scan replaces Aurora's aerial imagery for the geometry the roof actually has today.
WHEN NOT TO CHOOSE FORGE

If the bulk of work is single-family residential reroofs and a single estimator handles bidding from a desk, the existing stack may be a better fit. Charter is built for the operator with multiple commercial crews and a change-order trail to defend.

ii.The operator — in his own words
All Weather Roofing logo
FIG. IALL WEATHER ROOFING
ALL WEATHER ROOFING · OWNER · COMMERCIAL DIVISION

I stopped renting estimating software the day Mark walked me through Hyperion on a real commercial roof. We bid out the truck door now. My crew thinks I hired a second estimator.

BIDS / DAY
38%
WIN RATE LIFT
0
TOOLS REPLACED
Samantha Whitfield
All Weather Roofing
iii.Questions a working operator asks

The honest answers,
without the sales gloss.

01.
How accurate is Hyperion compared to a manual takeoff?

Forge publishes a single accuracy figure for Hyperion: ±0.8% on commercial flat and low-slope geometry, ±2% on tighter, more complex geometry. The methodology behind that figure — comparison baselines (certified manual takeoffs and total-station survey), capture protocol, sample plan, reporting cadence — lives at /proof/hyperion-accuracy. The figure is currently published as methodology and sample plan; it graduates to a measured benchmark when the first independent third-party verification set completes. The page tracks updates with stated dates so the reader can see what changed and when.

02.
Does Forge replace ServiceTitan or AccuLynx for roofing?

Forge is the chest. Estimating, scheduling, CRM, dialer, change-orders, payroll, and Hyperion are all native modules in one federation, not bolted-on integrations. Charter operators have moved off ServiceTitan, AccuLynx, and Aurora — usually cancelling three subscriptions to do it.

03.
Will Hyperion work on my crew's existing iPads?

Hyperion requires iPad Pro M-series with the LiDAR sensor — iPad Pro 2020 onwards. iPadOS 18 minimum. We don't support older iPads because the LiDAR depth resolution on those rigs isn't honest enough to bid from. We won't ship a tool that lies to the operator.

04.
What does Charter cost for a roofing operator?

Charter Master: $27,000 prepaid for 36 months — a $750/month equivalent rate, locked forever. The public list for the same Master tier rises to $1,499 then $1,999 in years two and three. Charter members keep $750. That's the covenant.

iv.The covenant — how to get in

1 of 2 roofing seats
filled.

Charter is the operator who builds with the new tools first. Ten seats across all trades. Locked when filled. The rate doesn't move — ever — while the public list rises around you.

ROOFING · CHARTER
1 roofing seat remaining.
RATE
$750/mo · locked forever
TERM
$27,000 prepaid · 36 months
PUBLIC LIST RISES TO
$1,499 → $1,999
CHARTER HONORS
Badge · case study · office hours · first-in-line
THE SPINE — RETURN

The needs have been the same for 4,000 years.
Roofing is the oldest. Hyperion is the newest tool for it.

Read the full Forge story →